Our Services
Find out what we can do for you
on land and underwater.
INSPECTION
Visual diagnostics, cartography of anomalies, detailed report with maintenance recommendations.
▶︎ Guarantee the safety of your installation and the public every 3 years :
◁ Visual inspection
◁ Measurement instruments and recording material
◁ Graphic report ; plans, pictures and colour critic scales
◁ Maintenance recommendations
▶︎︎ Evaluation of your structure to establish a maintenance program :
◁ Visual and NDT inspections (Non Destructive Test)
◁ Measurement survey, taking samples and laboratory tests
◁ Construction documentary analysis
◁ Assessment of your installation
◁ Submission of graphic report and maintenance schedule
▶︎︎ Identify the source of the leakage to solve it :
◁ Dye tracer tests underwater
◁ Underwater reading of the rebate, signs of deterioration or biological life
◁ Pressurized air technics
MAINTENANCE
Interventions on primary and secondary sealants, leak repairs, sanding and polishing acrylic panels.
Works in atmospheric and underwater conditions.
▶︎ Detection and repair of leaks on both sides :
◁ Inside the tank, in wet condition
◁ Outside the facility, in dry condition
▶︎ Restore the clearness of your underwater window :
◁ Sanding and polishing acrylic panels to reach their maximum potential of optical transparency
︎▶ Extend the lifespan of your joint with a layer recovering it :
◁ Protect your sealant from marine life and biological agressors
◁ The maintenance can be executed while the public visit your installation
︎▶ Underwater assistance for lifting large objects or difficult access.
INSTALLATION
From design to completion of works, we assist you in your project.
Guidance in the choice of materials and technics to obtain the best quality and durability.
Laboratory test for materials compatibility, protocol of cleanroom and climatic control.
︎▶ Our experience will bring you the assurance of finest work :
◁ Guidance in the choice of waterproofing, silicone, metal and combinaison of materials
◁ Advises for the design and technics to be used
◁ Controls of works
◁ Elaboration of solution in critical situation
▶︎ Placement of acrylic panel and its sealing :
◁ Three element waterproofing system : primary joint, secondary joint and hyperbaric chamber
◁ Lab test on adhesion's materials
◁ Protocol of cleanroom
◁ Climatic control during the cure of silicone
◁ Pressurize the hyperbaric chamber
▶︎ Full or partial renovation around the acrylic panel:
▽ Full renovation (re-do all the works)
◁ Lift and store the panel (sanding and polishing)
◁ Remove the waterproofing and the sealing
◁ Apply them again
▽ Partial renovation (when the waterproofing is still in good condition)
◁ Replacement only of the sealing system
◁ Sanding and polishing the acrylic
Are you set to build something extraordinary ?
Let's work together and let's make it the greatest adventure !